Do you know each set of shale shaker need which spare parts? Let's know together below.
Firstly, the shale shaker need a steel frame. The steel fram is calculated according to mechanics principles. If you have design drawing, you also can weld one.
Secondly, it need two motors to provide the vibrating force. The motors are choosed good brand Italy Oli and Martins. The vibrating force is more than 7.0 G, and the moroe power of each one is 1.5KW, 1.72 KW and even high G 1.94KW.
Thirdly, There need one electric control box to control the turn on and turn off of the shaker. The electric box is Ex-proof too.
Next, there are four springs. The springs are rubber or steel material. The function is the same.
Last, there is a very important and easy changed, shale shaker screens. Each shaker has 3 pcs of shaker screens or 4 pcs of shaker screens, now the shaker screen is 1165x585mm, for the users can buy the parts from anywhere. It is also have weldge block to fix the shaker screens.
More interest or requirement, welcome to visit our website and contact us!
Website: https://www.axsolidcontrol.com
Email: sales@jxsolidscontrol.com
2019年9月28日星期六
2018年9月20日星期四
The Purification Process of Drilling Fluid in the System
The Purification Process of Drilling Fluid in the System
1) Primary Purification
Primary purification is the drilling fluid treatment through Shale shaker. The configured drilling fluid was taken into bottom of drilling well, then turn back to the ground with drilling cuttings. Through the drilling pumps then come into the shale shaker. The shale shaker separate the bigger solids out from the drilling fluid.
2). The secondary purification
When the drilling fluid was soaked in gas, using the Vacuum degasser can remove the gas in the drilling fluid. So thus can recover the drilling fluid density, stable drilling fluid viscosity.
3). Tertiary purification
After the secondary purification, the drilling fluid enters the Desander by the power of centrifugal pump. Through the desander's hydrocyclones, the solids size bigger than 40-60 micron meters were separated out.
4). The level fourth purification
After the tertiary purification, the drilling fluid enters the Desilter by centrifugal pump. Through the desilter's hydrocyclones, the solids size bigger than 15-40 micron meters were separated out.
5). The fifth level purification
The drilling fluid after the fourth level come into the Decanter Centrifuge by the power of Screw pump. The decanter centrifuge can separate the solids size 5-15 micron meters out.
Completer Photos:
Origin: Hebei JinXin Machinery Co., Ltd
Email: alisa@jxsolidscontrol.com
1) Primary Purification
Primary purification is the drilling fluid treatment through Shale shaker. The configured drilling fluid was taken into bottom of drilling well, then turn back to the ground with drilling cuttings. Through the drilling pumps then come into the shale shaker. The shale shaker separate the bigger solids out from the drilling fluid.
2). The secondary purification
When the drilling fluid was soaked in gas, using the Vacuum degasser can remove the gas in the drilling fluid. So thus can recover the drilling fluid density, stable drilling fluid viscosity.
3). Tertiary purification
After the secondary purification, the drilling fluid enters the Desander by the power of centrifugal pump. Through the desander's hydrocyclones, the solids size bigger than 40-60 micron meters were separated out.
4). The level fourth purification
After the tertiary purification, the drilling fluid enters the Desilter by centrifugal pump. Through the desilter's hydrocyclones, the solids size bigger than 15-40 micron meters were separated out.
5). The fifth level purification
The drilling fluid after the fourth level come into the Decanter Centrifuge by the power of Screw pump. The decanter centrifuge can separate the solids size 5-15 micron meters out.
Completer Photos:
Origin: Hebei JinXin Machinery Co., Ltd
Email: alisa@jxsolidscontrol.com
2018年9月18日星期二
Solids Control System's Composition Equipment (II)
Now we continue yesterday's solids control system's composition equipment. To make sure the drilling fluid's good performance, different drilling rigs has different solids control equipment. According to SY/T6223-2005 "Use and Maintenance of Drilling Fluid Cleaning Device", the 4000-7000 meters' drilling rig solids control equipment is as below:
2).
2).
| 5000 meters' solids control equipment paramete | |||
| No. | Equipment Name | Parameters | Qty. |
| 1 | Mud Tank | Total effective volume is no les than 200 m3, the storage tank volume is more than 120 m3 | 1 Suit |
| 2 | Shale shaker | Treating capacity is no less than 181.5 m3/h | 2 Sets |
| 3 | Desander | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 4 | Desilter | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 5 | Mixing Devices | Sand pump's flow rate:200m3/h, head: 36m | 1 Suit |
| 6 | Shearing pump | Shearing pump's flow rate:155m3/h, head 32m | 1 Set |
| 7 | Grouting pump | Flow rate: 50m3/h, head 28m | 1 Set |
| 8 | Degasser | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 9 | Middle speed centrifuge | Treating capacity: 40 m3/h. separation size: 5-7μm | 1 Set |
| 10 | High speed Centrifuge | Treating capacity: 40 m3/h. separation size:3-5μm | |
3).
| 7000 meters' solids control equipment paramete | |||
| No. | Equipment Name | Parameters | Qty. |
| 1 | Mud Tank | Total effective volume is no les than 270 m3, the storage tank volume is more than 160 m3 | 1 Suit |
| 2 | Shale shaker | Treating capacity is no less than 181.5 m3/h | 2 Sets |
| 3 | Desander | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 4 | Desilter | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 5 | Degasser | Treating capacity is no less than 181.5 m3/h | 1 Set |
| 6 | Middle speed centrifuge | Treating capacity: 40 m3/h. separation size: 5-7μm | 1 Set |
| 7 | High speed Centrifuge | Treating capacity: 40 m3/h. separation size:3-5μm | |
| 8 | Mixing Devices | Sand pump's flow rate:200m3/h, head: 36m | 2 Suit |
| 9 | Shearing pump | Shearing pump's flow rate:155m3/h, head 32m | 1 Set |
| 10 | Grouting pump | Flow rate: 50m3/h, head 28m | 1 Set |
In the design requirement of solids control equipment, the mud tank's effective volume is the 75% of mud tank's outside size.
订阅:
博文 (Atom)

