Desander and Desilter's difference

Desander and Desilter's difference

The diameter of the hydrocyclone's upper parts is the important factor which decide the hydrocyclone's treating capacity and separation size. The diameter of the cylinder is called the nominal size of the cyclone. The lower cone part's angle is between 15-20 degrees. The diameter of underflow mouth is 10-30 mm. Generally, a group of hydrocyclones which nominal size is 150-300mm, is called Desander. And a group of hydrocyclones which nominal size is 50-125mm, is called Desilter.





According to the treating capacity required, the desander has one to three hydrocyclones. Each hydrocyclone's treating capacity is no less than 20-120m3/h under the pressure of 0.2 Mpa. The normal working hydrocyclones can remove 95% of particles bigger than 74 micron meters and 50% of particles bigger than 40 micron meters. In order to improve the using efficiency, in choosing the hydrocyclones, the treating capacity must be 125% of whole drilling capacity.


According to the treating capacity required, the desilter has more than 4 pieces of hydrocyclones. Each hydrocyclone's treating capacity is no less than 5-15m3/h under the pressure of 0.2 Mpa. The normal working hydrocyclones can remove 95% of particles bigger than 40 micron meters and 50% of particles bigger than 15 micron meters. The desilter can remove 12-13 micron meters' barites. So the desilter can not be used in treating heavier drilling fluid. In choosing the desilter, the treating capacity must be 125%-150% of whole drilling fluid capacity.


Email: alisa@jxsolidscontrol.com
     


2018年9月20日星期四

The Purification Process of Drilling Fluid in the System

The Purification Process of Drilling Fluid in the System
1) Primary Purification
    Primary purification is the drilling fluid treatment through Shale shaker. The configured drilling fluid was taken into bottom of drilling well, then turn back to the ground with drilling cuttings. Through the drilling pumps then come into the shale shaker. The shale shaker separate the bigger solids out from the drilling fluid.

2). The secondary purification
     When the drilling fluid was soaked in gas, using the Vacuum degasser can remove the gas in the drilling fluid. So thus can recover the drilling fluid density, stable drilling fluid viscosity.

3). Tertiary purification
     After the secondary purification, the drilling fluid enters the Desander by the power of centrifugal pump. Through the desander's hydrocyclones, the solids size bigger than 40-60 micron meters were separated out.

4). The level fourth purification
     After the tertiary purification, the drilling fluid enters the Desilter by centrifugal pump. Through the desilter's hydrocyclones, the solids size bigger than 15-40 micron meters were separated out.

5). The fifth level purification
     The drilling fluid after the fourth level come into the Decanter Centrifuge by the power of Screw pump. The decanter centrifuge can separate the solids size 5-15 micron meters out.

Completer Photos:



     
Origin: Hebei JinXin Machinery Co., Ltd

Email: alisa@jxsolidscontrol.com

2018年9月18日星期二

Solids Control System's Composition Equipment (II)

Now we continue yesterday's solids control system's composition equipment. To make sure the drilling fluid's good performance, different drilling rigs has different solids control equipment. According to SY/T6223-2005 "Use and Maintenance of Drilling Fluid Cleaning Device", the 4000-7000 meters' drilling rig solids control equipment is as below:

2). 
5000 meters' solids control equipment paramete
No.Equipment NameParametersQty.
1Mud TankTotal effective volume is no les than 200 m3, the storage tank volume is more than 120 m31 Suit
2Shale shakerTreating capacity is no less than 181.5 m3/h2 Sets
3DesanderTreating capacity is no less than 181.5 m3/h1 Set
4DesilterTreating capacity is no less than 181.5 m3/h1 Set
5Mixing DevicesSand pump's flow rate:200m3/h, head: 36m1 Suit
6Shearing pumpShearing pump's flow rate:155m3/h, head 32m1 Set
7Grouting pumpFlow rate: 50m3/h, head 28m1 Set
8DegasserTreating capacity is no less than 181.5 m3/h1 Set
9Middle speed 
centrifuge
Treating capacity: 40 m3/h. separation size: 5-7μm1 Set
10High speed
Centrifuge
Treating capacity: 40 m3/h. separation size:3-5μm

3). 
7000 meters' solids control equipment paramete
No.Equipment NameParametersQty.
1Mud TankTotal effective volume is no les than 270 m3, the storage tank volume is more than 160 m31 Suit
2Shale shakerTreating capacity is no less than 181.5 m3/h2 Sets
3DesanderTreating capacity is no less than 181.5 m3/h1 Set
4DesilterTreating capacity is no less than 181.5 m3/h1 Set
5DegasserTreating capacity is no less than 181.5 m3/h1 Set
6Middle speed 
centrifuge
Treating capacity: 40 m3/h. separation size: 5-7μm1 Set
7High speed
Centrifuge
Treating capacity: 40 m3/h. separation size:3-5μm
8Mixing DevicesSand pump's flow rate:200m3/h, head: 36m2 Suit
9Shearing pumpShearing pump's flow rate:155m3/h, head 32m1 Set
10Grouting pumpFlow rate: 50m3/h, head 28m1 Set

In the design requirement of solids control equipment, the mud tank's effective volume is the 75% of mud tank's outside size. 

2018年9月17日星期一

Solids Control System's Composition Equipment (I)

Solids Control System's Composition Equipment

Solids control system is used to store, configure, circulate and purify drilling fluid . 

Generally, its composition is Drilling fluid tank, Shale shaker, Degasser, Desander, Desilter, Centrifuge etc necessary five grade cleaning equipment. And also including overhead line (from drilling well to shale shaker), drilling pump's pumping line, mixing pimp's line, mud tank bottom connection line, feeding line, discharging line,  drilling line, shearing pump's suction and discharge line etc. 

The solids control system also equipped with drilling fluid replenishment system, chemical adding hopper, pumps, agitators, lights etc accessory equipment. In addition, the system also has passage, ladders, guard rail to make sure workers' safe.  The solids control system can remove the solids bigger than 5-15 micron meters effectively, and then keep useful solids, to provide good performance drilling fluid for the whole drilling progress.

To make sure the drilling fluid's good performance, different drilling rigs has different solids control equipment. According to SY/T6223-2005 "Use and Maintenance of Drilling Fluid Cleaning Device", the 4000-7000 meters' drilling rig solids control equipment is as below:
1) 
4000 meters' solids control equipment paramete
No.Equipment NameParametersQty.
1Mud TankTotal effective volume is more than 180 m3,
the storage tank volume is more than 80 m
the storage tank volume is more than 80 m3
1 Suit
2Shale shakerTreating capacity is no less than 181.5 m3/h2 Sets
3DesanderTreating capacity is no less than 181.5 m3/h1 Set
4DesilterTreating capacity is no less than 181.5 m3/h1 Set
5Mixing DevicesSand pump's flow rate:200m3/h, head: 36m1 Suit
6Shearing pumpShearing pump's flow rate:155m3/h, head 32m1 Set
7Grouting pumpFlow rate: 50m3/h, head 28m1 Set
8DegasserTreating capacity is no less than 181.5 m3/h1 Set
9Middle speed centrifugeTreating capacity: 40 m3/h. separation size: 5-7μm1 Set

In next blogger will continue the 5000 meters, 7000 meters' equipment details.